Hospital Santa Isabel ended

Coopérnico will have its first investment in photovoltaic production in Marco de Canaveses, in partnership with Santa Casa da Misericórdia of Marco de Canaveses. The Santa Casa da Misericórdia of Marco de Canaveses has the mission of offering health, social support and social responsibility services, as a way of showing the Institution's contribution to the community.

Coopérnico reviews and supports SCMMC in its objective of pursuing the vision of the future that bets on citizenship and on responses aimed at social and territorial cohesion. With this investment made exclusively by our collaborators, Coopérnico will install a photovoltaic system for self-consumption (UPAC) at Hospital Santa Isabel, managed by this institution.

The renewable energy produced by this photovoltaic installation is equivalent to the annual consumption of 62 families and will avoid the emission of 104 tons of CO2/year. This partnership will also allow for a reduction in the electricity bill for the Marco de Canaveses SCM.

This project opens for investment on 6/28/2021, at 10am.
State Active
Location Marco de Canaveses
Network Power 96.0 kW
Total Investment 60 750 €
Host SCM Marco de Canaveses
Technology
Power 110.4 kW
Annual Output 162 185 kWh
CO2 Savings 103.8 Ton CO2/Year
Number of Houses Powered 62
Connection Date February 24, 2023
Number of Panels 248
Panel Type Suntech de 445Wp
Panel Warranty 12 Years
Inverter Type Huawei
Inverter Warranty 5 Years